Rise over run is the whole of a slope. The calculator writes that ratio four ways — percent, degrees, per mille, 1 in n — because a roofer, a highways engineer and a plumber do not share a unit. The hypotenuse, the length actually walked, comes out of the same pair of measurements.

The second tab reverses the sum. A target gradient and a run that will fit on the plot give the rise. That is the ramp sized before the slab is poured, or the roof whose fall is wanted across a known span.

A 100% slope is not a wall. Rise equals run, so the angle is 45°. A path at 100% that advances 100 m on plan climbs 100 m, and the distance travelled is 141.4 m.

αLHslope length
L = horizontal length, H = height, α = the slope's angle from horizontal.

Calculating the slope

Both measurements taken on site: the calculator works out the slope.

Length and height

A target slope and the length available: the calculator works out the matching height.

Length and target slope

Trade terms marked with an asterisk are spelled out in the glossary at the end of the article.

Rise over run: percent, degrees, 1 in n, per mille

Every slope is a ratio of rise* to run*. The trades simply refuse to write that ratio the same way. Mix two notations on one drawing and a 1-in-12 ramp becomes a 12° ramp — then fails inspection.

Percent is the highway and earthworks habit: 8% is 8 m up in 100 m of run, in other words a rise of 0.08 for every unit of run. Degrees belong to roofs and trigonometry; 45° is 100%, not a wall. British specifications like 1 in n — one of rise to n of run; the larger n, the gentler the slope. Per mille is for the shallow stuff, sewers and rail: 5‰ is 0.5%.

  • % — roads, earthworks, ramps. 8% = 8 m up in 100 m of run.
  • Degrees — roof pitch, carpentry. 45° = 100%.
  • 1 in n — ramps, cuttings, British specs. 1 of rise to n of run.
  • ‰ — sewers, railway. 5‰ = 0.5%.

grade (%) = 100 × rise / run  ·  α = arctan(rise / run)  ·  1 in n, n = run / rise

This page converts all four at once. The run entered has to be the horizontal one, not the rafter length. Swap them and the pitch* inflates, and the covering table later will not save the roof.

Roof pitch and what the covering will actually take

Water has to leave the slope. Each covering has a floor, below which it is decoration. That floor is the manufacturer's table, often written in degrees in British practice, sometimes tightened by exposure — a wet, windy coast is not a sheltered valley.

Interlocking concrete tiles commonly start around 22.5° (about 41%), product by product. Plain clay wants more, often 35° and up. Natural slate sits around 20° to 25° in a mild climate, steeper on a west coast. Profiled metal can go low, 5° to 10°, if the laps and sealant actually work. A green or "flat" roof wants 1% to 2% fall — enough to drain, not enough to send the substrate downhill. BS 5534 and the tile agrément, not the neighbour's memory, settle the argument when a pitch sits on the edge of the table.

The flatter the pitch, the more the waterproofing has to be real, continuous, inspected. The steeper it is, the more the fixings and the fall-arrest kit show up on the quote. Developed roof area is a separate sum: the roof-area calculator starts from the plan area and the pitch. This page does not sell tiles. It only says whether the triangle stands up before the table is opened.

Accessible ramps under Approved Document M

Approved Document M* (England) prefers 1:20 on a going* wherever the plot allows it — in other words 5%, the shallow end of the table. 1:15 is a working maximum on many flights. 1:12 is reserved for short ramps with rest landings. Clear width is often 1.5 m in public work; 1.2 m is a hard floor in tighter cases. Crossfall stays around 1 in 50 — water yes, a wheelchair tipping toward the edge no. Handrails both sides, a non-slip finish, and a landing at top and bottom are part of the same package, not extras to add if the budget survives.

The US ADA book leads with 1:12 as a general maximum and 1:48 across. Different code, same geometry. Neither book is "a bit steep, it will do". A 12% pinch in the middle of a ramp that is "5% on average" is enough to fail the inspection, even if the total rise would have fitted.

The figures shown after a calculation are a sense-check against those orders of magnitude. They do not replace the applicable approved document, ADA chapter, or access statement. A house, a school, an existing public building: three texts, three thresholds, sometimes the same triangle.

Setting out square with 3-4-5

To get rise and run at a right angle, a 1 m square is not always in the van. Three units one way, four the other, five on the diagonal. If the diagonal is not five, a peg moves until it is. Tape, staff, string line: the same ratio. 900 mm, 1.2 m, 1.5 m on a slab. Three feet, four feet, five feet on a timber frame.

Pythagoras in boots. 3² + 4² = 9 + 16 = 25 = 5². Nothing else. An angle that is not square falsifies the run, then the gradient, the covering and the ramp. Five minutes of string beats a roof out of square when the battens go on. The same triple, scaled up, squares a door lining, a garage slab, a stringer.

Average gradient versus cumulative climb

The average gradient* of a route is net rise divided by distance. Cumulative climb is every uphill added, including the ones later lost on the way down. A valley out-and-back can average 0% and still show 400 m of climb. Both numbers are true. They do not answer the same question.

On a footpath, cumulative climb tells the effort. On a road, average gradient sketches the profile. Yet a ramp does not accept that average. Only the local pitch counts — the steepest metre. "5% on average" with a 12% pinch is not compliant, even if the total rise would have sat inside the limit.

Foul and land-drain falls

A soil pipe laid too flat silts up. Laid too steep, the water outruns the solids and the pipe furls with paper. Gravity foul wants a middle, read on the invert, not on the crown of the pipe. A common rule of thumb for 100 mm foul is 1:40; larger diameters can go shallower, around 1:80, if the flow is there. BS EN 12056 sets the design falls; the site still has to deliver them, pipe by pipe, without a sag between brackets. A garden land drain often works at 1:200 to 1:300, provided the fall is continuous and the silt trap can still be lifted.

A roof-outlet overflow follows the same idea, flatter still. Fall is not "a bit of slope by eye". Rise over run is calculated, the invert is checked, then the pipe is laid. Three millimetres of backfall in the middle of a twenty-metre run is a blockage with a date on it.

Crossfall on a carriageway or a ramp

Crossfall is not the gradient along the line of travel. It is the slope across, the one that sheds water to the channel or the edge. On a carriageway, 1:40 to 1:60 often does. On an accessible ramp, about 1 in 50. Enough for water. Not enough to walk a bicycle, a chair or a trolley down to the kerb.

Five percent across 1.2 m of width is already 60 mm of difference from one edge to the other — a step, on one side. It is kept small. A car park on a single fall, with no channel, ends as a puddle at the low point and sheet ice at the high one. Two falls meeting, a gully, and the water has a job.

Worked example: a 600 mm rise

Rise 0.60 m, target 1:20 (5%). Run = 0.60 × 20 = 12 m. Hence twelve metres of going before any landing is added. A landing of 1.2 m or more — often mid-flight, or at top and bottom — clear width 1.2 m at least, handrails both sides, non-slip finish, crossfall 1:50. This page gives the 12 m and the four notations. Landings, rails, the sign, the guarding: the rest of the package.

run = rise / (grade/100)  →  0.60 / 0.05 = 12 m  ·  at 1:20, run = 20 × rise

The second tab reverses it. Twelve metres available, 1:20 wanted, the rise comes out at 0.60 m. If the real level difference is 0.72 m, either the run grows or the flight is split with a landing. The gradient is not "tightened a bit" to 1:16 in the hope that nobody measures it.

Measure the run, not the rafter

A laser along the rafter measures the hypotenuse. Pitch wants the neighbour on plan. At 30°, cosine 0.866: about fifteen percent out if the two are swapped. The displayed pitch flies up, the covering "passes" on paper and weeps at the first storm.

Two ways out. Recover run = rafter × cos α, if the angle is already known. Or measure on the floor, between plumb lines. On a reroof, the rafter is what is in reach; it is converted. On new work, the run is measured. Both fields on the form expect that run, not the diagonal.

Ten percent is not ten degrees

Percent is not an angle in cheap clothing. Ten percent is arctan(0.10), about 5.7°. Thirty percent is about 16.7°. One hundred percent is 45°. The relationship is not a straight line: near horizontal, a percentage point and a degree still look alike; the further the slope stands up, the more they part company, hence the gap that opens once the near-flat is left behind.

A tiler asking for "thirty" may mean percent. A carpenter may mean degrees. Yet the two are not interchangeable, and the batten has no sense of humour. The unit is asked for. This page lines them up, so that "thirty" becomes a number with a symbol on it.

Stair pitch is not a ramp

A comfortable house stair sits around 30° to 35° — sixty to seventy percent. An accessible ramp sits at five to eight. A stair that is too steep is not "ramped", and a ramp that is too long is not "walked" in the hope that Blondel's rule will sort it. Going, riser, and the 2R+G check belong to another triangle, handled by the stair-dimensions calculator.

The two often share a lobby: stairs for people on foot, a ramp for people on wheels, a common landing. Each keeps its own pitch. Combining them on one stringer produces an object nobody uses well.

Patio paving needs a fall

A "flat" patio that puddles is not flat. It is falling the wrong way, or not falling at all. One to two percent toward the edge, a channel, an overflow: water has a job again. Past about three percent, furniture starts to wander and walking becomes a chore. Against a house wall the fall runs away from the damp-proof course, not toward the threshold — a detail that looks obvious on paper and is still poured backwards more often than it should be.

Laying out the slabs — size, joints, cuts — is the job of the paving calculator. The fall is decided before the first slab. It is calculated here, built into the bed, not rescued in the joint.

Glossary

Rise
The vertical height of the slope, from the low end to the high end. In the triangle, the opposite side to the plan.
Run
The horizontal length, measured on plan — not along the slope. It is the adjacent side, and the figure the percentage is built on.
Pitch
The slope of a roof, usually quoted in degrees in British work (and sometimes as a ratio, 4-in-12, in North America). It is still rise over run.
Approved Document M
The English statutory guidance on access to and use of buildings. For ramps it sets preferred and maximum gradients (1:20, 1:15, 1:12), landings and widths. Other nations have their own books; the geometry does not change.
Going
On a ramp or a stair, the horizontal distance travelled in one flight, landings excluded. On a stair it is also the depth of one tread; on a ramp it is the run of that flight.
Gradient
The slope of a road, path or railway, usually as a percentage or as 1 in n. Same ratio as a roof pitch; different trade, different word.