Calculate How Much Flooring You Need (Packs)
The number of packs of flooring to buy isn't a simple rule of three: it depends on the plank format, the laying direction — a diagonal lay wastes more material at the row ends than a straight lay — and a safety margin for cuts and damaged planks. Room dimensions and plank format give the number of packs to order.
Room and plank format
A starred term is unpacked in the glossary at the foot of the page.
Waste allowance: why 8% is a habit, not a rule
Eight percent is a merchant's habit, not a British Standard. It sits on this form because a straight staggered lay in a rectangular room usually loses 5–7 % at the cut ends, and the extra point covers a doorway or two. Raise it for a diagonal, a herringbone, a bay window, a chimney breast. Drop it, cautiously, in an empty rectangle with long boards and few doors.
The waste allowance* is not a tax on incompetence. It is the geometry of a plank that will not finish exactly on a wall. Every row ends with a cut. The offcut starts the next row if it is long enough — a third of a board, as a rule of thumb — and goes in the bag if it is not.
area to order = floor area × (1 + waste)
That said, a spare sealed pack in the loft is cheaper than a cracked click on a Saturday afternoon. Merchants rarely take back an opened carton a fortnight later, and a top-up from a new batch is a different colour. The allowance on the form rounds the area; the spare pack rounds the risk.
The first and last rows decide more of the true waste than the percentage ever will. A 40 mm strip along the far wall means a whole plank sacrificed down the length of the room. Setting out with a dry row, and shifting the start so both edges land on at least a third of a board's width, saves a pack that no formula will recover.
Solid, engineered or laminate: click-lock versus glue-down
The arithmetic is the same three times: room area, waste, plank size, then round up to whole packs. What changes is how much waste the product actually burns, and whether the floor is nailed, glued, or locked together as a floating sheet.
- Solid wood — one piece of timber, often 14–22 mm. Secret-nailed to joists or glued to a screed. Lengths wander. A short offcut is rejected, a grain match is hunted. The order sits a little above the calculated minimum.
- Engineered* — a real hardwood wear layer on plywood or HDF*. More stable than solid, less fussy about central heating. Floating or glue-down. Regular lengths, easier to count.
- Laminate — printed décor on an HDF core, almost always a floating floor with a click-lock* joint. Packs are labelled in square metres. This calculator is built around that product.
Twenty square metres of living room is twenty square metres of all three. Solid may eat an extra pack for the matching. Laminate will not — unless the pattern turns on the diagonal, or the room is all recesses. Click-lock is not a glue-down with a different name: the whole floor moves as one plate, which is why the expansion gap and the underlay* belong on the same ticket.
BS 8201 covers timber flooring in outline; the manufacturer's data sheet still wins on waste, click type and whether a floating floor is even allowed. Where the two disagree, the higher figure protects the job.
Straight, diagonal and herringbone: how the pattern eats packs
Straight laying, boards running with a wall, joints staggered row to row, is the cheap pattern. Waste sits around 5–7 %. The 8 % default on this page is that figure with a little air for doorways. It is the pattern of most UK living rooms and almost every hallway.
Turn the same boards at 45° and every row starts with a triangle. Offcuts pile up. 10–15 % is realistic. Herringbone — not an “English pattern”; that phrase does nothing at a builders' merchant — is hungrier still: small pieces, left- and right-handed blocks on some ranges, 12–15 % without trying, more in a tight room with a chimney breast.
In short, the pattern is chosen before the packs are ordered, not after the first row is down. A herringbone sold as a “plank” range may in fact be a block product with a different pack size. The form still works if the plank dimensions and the pieces per pack match the box, not the brochure photograph.
Which way the boards run, and why the window matters
Boards run towards the main window. Light then travels along the joints instead of catching every groove as a stripe. Not a British Standard. Just what the room looks like on a low winter morning, walking in from the hall.
A hallway still wants boards down its length, window or no window: perspective beats sunlight. A square bay: follow the glass. Two windows opposite each other — the wall faced in the evening is the one that counts. In practice the setting-out drawing wins. If “towards the light” wrecks an L-shaped lounge, the argument happens before the order, not after the first cut.
Victorian floorboards usually run across the joists, which in a terrace often means towards the bay. Following that line with a new laminate keeps the doors and the chimney breast in the same conversation as the floor. It is not nostalgia. It is the room already deciding.
Underlay and DPM: order them with the floor, not afterwards
A floating floor on a concrete slab needs underlay — acoustic, a little thermal, a little levelling. Buy the room area, not the plank waste. A knife and a small overlap. Five percent covers trims and a short roll. Recycled rubber, wood fibre, thin foam: the flooring maker usually states a maximum thickness and a compressive class, especially over underfloor heating, where every millimetre of foam is another blanket on the pipes.
Ground floor, new screed, anything that can wick: a DPM* (1200-gauge polythene, in old trade talk) under the underlay, 150–200 mm laps, taped, dressed up the walls behind the skirting. Some underlays already carry a foil. Two sheets stacked “to be sure” trap moisture between them. One continuous layer.
Even so, a DPM is not a licence to lay on a wet slab. A new sand-cement screed needs time, and a moisture reading, before timber or laminate goes down. The sheet stops rising damp. It does not dry a pour that is still green.
Skirting boards and threshold strips
Skirting hides the expansion gap. Perimeter minus doorways, plus 5 % for mitres. Sold in 2.4 m lengths more often than not — round up. A 5 × 4 m room with a 900 mm door is 17.10 m of useful length, so eight sticks, not seven “because it should go”.
Every change of floor — kitchen tile, a different room, the hall — takes a threshold strip, cut to the opening plus a little. A long run may also need a transition profile mid-room. The calculator ignores both. The order should not. Door linings need a saw-cut at the bottom so the plank tucks under; that cut is not in the pack count either, but it is on the Saturday list.
Walls get painted after the floor is in and the skirting is screwed — to the wall, never to the boards. The paint quantity calculator takes over at that point. Paint first and the new planks take the drips. Paint last without skirting and a raw band sits along the plaster.
Acclimatising packs in the room they will live in
Forty-eight hours in the actual room, packs opened or at least slit, laid flat, away from the radiator. Roughly 18–22 °C, 40–65 % RH. The manufacturer's leaflet overrides this if it asks for longer — solid oak often does.
Laminate off a cold lorry, clicked the same morning, often opens its joints a week later. The core moves. It finishes moving before the first row goes down. A room still in fit-out, windows open, screed fresh, is not an acclimatising room: the packs take in site moisture and give it back once the heating comes on.
Packs do not wait in the garage overnight “to keep them out of the way” and then go down at dawn. The room they will live in is the room they wait in. Upright against a wall, boards hog. Flat, in the pack, they stay true.
Batch and shade codes
Every pack carries a batch number and, on printed décors, a shade code. One order, one batch. A top-up a fortnight later is another dye lot. If two batches cannot be avoided, boxes are mixed across the floor; one wall is never finished from batch A and the next started from batch B.
Three packs opened on delivery show a décor miles from the sample, or an oak that has gone orange, before the first click. After that, returns get harder. A repair six months on has every chance of being a different bath — which is why one sealed pack from the same lot earns its keep in a dry cupboard.
Worked example: laminate in a 20 m² living room
Room 5.00 × 4.00 m, straight staggered lay, 1,200 × 190 mm planks, 8 per pack, 7 % waste. One 900 mm door to the hall.
- Floor area: 5.00 × 4.00 = 20.00 m².
- With waste: 20.00 × 1.07 = 21.40 m².
- One plank: 1.20 × 0.19 = 0.228 m².
- Planks: 21.40 / 0.228 ≈ 93.9 → 94.
- Packs: 94 / 8 = 11.75 → 12 packs.
12 × 8 × 0.228 = 21.89 m² bought for 20 m² of floor
Underlay: the 20 m² plus a strip — a 15 m² roll will not do; two tens, or a twenty and a leftover. Skirting: 2 × (5 + 4) − 0.90 = 17.10 m, eight 2.40 m lengths. One threshold at the doorway. Worth noting: the pack count is not the shopping list.
The extra 0.49 m² (21.89 − 21.40) is the round-up to a whole pack, plus a couple of boards for a broken click, plus enough to patch a worn doorway in two years without buying a carton from a different year.
The expansion gap
A floating floor needs room to move. Leave 8–10 mm at every wall, door lining, pipe and kitchen plinth. Spacers come out before the skirting goes on. Pinch that gap and the floor peaks, or it shoves the boards off the wall. Skirting is screwed to the wall, never down into the planks.
Planks do not tuck under a fitted wardrobe or an unsawn door lining. Runs longer than about 8–10 m in one direction want a break profile in the middle — not a heavy rug “to hold it down”. Around a radiator pipe, a 20 mm hole for a 10 mm tube, closed with a pipe collar, gives the same crescent of air the walls already have.
Underfloor heating and a dry screed
Many UFH data sheets want glue-down, not a floating click. A floating floor adds a thermal blanket nobody asked for, and the boards still move. Surface temperature is often capped around 27–28 °C. The system comes up slowly after laying, not on full the first night.
The screed must be dry — a proper moisture test, not a hand on the slab — and the heating should already have run its initial warm-up cycle. A DPM will not save a wet pour. After all, the sheet stops vapour from below; it does not pull water out of a green screed.
New partitions are finished before the floor goes down. Jointed plasterboard still shedding dust, or a taping coat that has not gone off, is a poor neighbour for a click floor. The plasterboard calculator sizes that lining; the laminate waits until the joints are hard and the room is closed.
An L-shaped room
The form is a rectangle. An L is two rectangles added together. A big box that includes the missing corner inflates the area and, worse, lies about the length-to-width ratio that the setting-out depends on.
The row that turns the corner makes waste that 7 % may not cover. Lift it to 10 %, and keep the long offcuts: they start the next row. Ten minutes with a scale sketch beats a panic order on Saturday.
The run of the boards is chosen once for both legs. Turning the pattern 90° in the short wing splits the floor into two rugs. Carrying the line through, even if the return eats more cuts, holds the room together.
Stairs, nosings and a different waste figure
A staircase is not a small room. Each tread takes a cut piece, a riser often takes another, and a nosing profile finishes the front edge. Click-lock along a flight is possible on some ranges and forbidden on others; the data sheet, again, is the document. Waste on stairs commonly sits at 15–20 %, and the nosings are a separate line on the ticket.
Doorways on the landing eat threshold strips, not planks. Winders eat more than straight treads. None of that belongs in the room-area field of this calculator. Two sums — the rooms, then the flight — keep the pack count honest, and keep a stair nosing from being improvised out of a ripped plank on a Sunday.
Glossary
- Waste allowance
- The extra percentage added to the measured floor area to cover end cuts, doorways and a little damage. Typical figures: 5–8 % for a straight staggered lay, 10–15 % on the diagonal, more for herringbone. It is a site habit, not a standard.
- Engineered flooring
- A real hardwood wear layer bonded to a plywood or HDF core. More dimensionally stable than solid timber, suitable for floating or glue-down, including many underfloor-heating jobs.
- Click-lock
- A machined joint that locks adjacent planks together without adhesive. The finished floor is a floating plate, not a floor nailed to the joists — hence the expansion gap and the underlay.
- HDF
- High-density fibreboard. The core of laminate and of some engineered boards. Denser than ordinary MDF, it holds the click profile and dislikes standing water.
- Underlay
- The sheet laid under a floating floor: foam, recycled rubber or wood fibre. It takes up minor unevenness, cuts impact sound, and adds a little thermal resistance. Ordered by room area, not by plank waste.
- DPM
- Damp-proof membrane. A polythene sheet (often still called 1200 gauge) that slows moisture rising from a slab or ground floor. One continuous layer, lapped and taped — never two sheets stacked.