Rebar Calculator for a Concrete Slab
The reinforcement of a concrete slab — often a welded wire mesh — is laid out as a grid: bars running one way, bars running the other, spaced at a regular mesh spacing. That grid takes up the tensile forces plain concrete can't carry on its own.
Enter the slab dimensions, the mesh spacing in each direction and the bar diameter: the calculator returns the number of bars, the total length and the steel weight to plan for.
Order-of-magnitude sizing for a single mesh layer (no bar lap splices, no separate top/bottom layer): a code-compliant design (Eurocode 2 or the local building code) is a structural engineer's job.
The slab and the mesh
Trade terms marked with an asterisk are spelled out in the glossary at the end of the article.
A142, A193, A252, A393 fabric versus cut-and-bent bar
A British merchant's rack holds two answers to the same job. Concrete is strong in compression and weak in tension. Something has to take the pull. Welded fabric to BS 4483 arrives as a sheet, wires already crossed and welded. Rebar* — high-yield B500B, tagged H10, H12, H16 — arrives as bar, cut and bent on a schedule or on a bender in the yard.
A393* is the sheet a lot of single-car garage slabs actually get: 10 mm wires at 200 mm centres, 393 mm²/m, about 6.16 kg/m². A252 (8 mm, 252 mm²/m, 3.95 kg/m²) copes with a lighter car on decent ground. A193* sits at the bottom of the domestic range. A142* is paths, shed bases, a thin patio — not a driveway that will see a van. Continental ST stamps turn up on imported pallets. They are not what the ticket says at a UK yard, and ordering “ST25” at the counter wastes a morning.
Bar wins on odd shapes, fat point loads, and a strip of top steel over a wall. Fabric wins on speed. Plenty of ground-bearing slabs use both: A393 in the bottom, a few H12s around the edge. Standard sheet 4.8 × 2.4 m covers 11.52 m² and, in A393, weighs a little over 70 kg — a two-person lift on A252, a mechanical lift once the wire thickens. B-series fabric (different area in each direction) exists for suspended slabs; a ground-bearing garage almost never needs it. This page counts metres of bar. The merchant sells sheets.
Cover: steel never sits on the DPM or the formwork
Forty millimetres. Sometimes thirty-five. Almost never the hopeful twenty that “looks plenty” on a 100 mm slab.
Cover* is the concrete jacket around the steel. It keeps water and chlorides off the bar, and it is what the bar bonds to. Skimp it and rust expands, then the slab splits from the inside. A fabric sheet sitting on the DPM is not reinforcement. It is a rusty tray, with no lever arm left to take tension.
Ground-bearing work in the UK usually wants about 40 mm to BS 8500, not a hopeful 20. Eurocode 2* writes that as cnom = cmin plus an allowance (often 10 mm). Chairs and spacers, every 500 to 800 mm, hold the mat in the bottom third while the pour runs. Kick them over and the mat dives. Leave them out and it sits on the DPM. The mix for the concrete sets strength and workability; cover is decided before the chute arrives.
Zero cover is not a finish pulled back with the rake. It is exposed steel. Eurocode 2 does not bargain that away, and neither does a building-control officer.
Bottom mat and top mat on a ground slab
Ground-bearing work puts the useful steel in the bottom third. That is not a preference. It is where a hatchback actually pulls the concrete apart.
One layer does most house slabs on the ground. Bottom. Chaired. A fridge, a pallet, a family hatchback: all of that puts the soffit in tension. A top mat arrives once the slab is thick (200 mm and up), heavily loaded, or suspended — beams, a void, an upper floor. Negative moment lives near the supports, where the top fibre opens. Chairs set the gap. A single-car garage on a compacted sub-base is still a bottom A393 job, not a two-layer drawing. A motorhome or a tractor is a different drawing.
Mixing the two cases is the classic “put a sheet in and it will do”. A slab that bears on the ground is not a slab that spans. The first can live on fabric in the bottom third. The second needs a calculation.
Lap length on fabric sheets and on high-yield bar
Sheets are not butted. Force has to jump the joint.
Fabric: at least two pitches — 400 mm on a 200 mm grid — and tied. High-yield bar in tension is often about 40d: 400 mm for H10, 480 mm for H12, more in poor bond or where the code says so. A short lap* is not a saving. It is a crack with an address, right at the splice.
llap ≈ 40d in tension · fabric: 2 pitches min.
Two sheets that kiss without a lap are two slabs glued by concrete. The day a crack appears, the line is already drawn. Tying is not decoration: an untied lap walks during the pour.
Wire size and pitch from thickness and load
Tighter pitch, fatter wire: more mm²/m. Thickness and what sits on the slab decide the rest.
- 75–100 mm, foot traffic, a patio — A142, sometimes A193.
- 100–150 mm, private car — A252 or A393, one layer, bottom.
- 150 mm and up, vans, poor ground — A393, or two layers, and an engineer.
These tickets get a house built. They do not get a warehouse signed off, or a turning head for a delivery lorry. Eurocode 2 also sets a minimum area, even without much bending, so cracking stays in hand.
As,min = max [ 0.26 × (fctm / fyk) × b × d ; 0.0013 × b × d ]
C25/30 concrete (fctm ≈ 2.6 MPa) and 500 MPa high-yield: around 130 to 180 mm²/m depending on effective depth. A393 at 393 mm²/m covers that floor for a 100–150 mm domestic slab. Real loads can ask for more. The minimum is not the design. BS 8110 said much the same, with different factors; site habit did not flip overnight when EC2 took over.
Edge bars, chairs and the extras around the grid
The main grid does not close the slab. Along walls, at a re-entrant corner, round a manhole, H10 or H12 goes in as a U or a closed link, sometimes with stirrups. That holds shrinkage at the perimeter and ties the slab into the wall or the ground beam.
Turning the fabric up at the edge helps. Dedicated bars do it cleaner. They go with the mat. They do not replace it. Skip the re-entrant corner and the crack already has an L to follow. Chairs are not optional kit: without them, “bottom mat” is a guess made after the pour. Plastic chairs on a DPM are the usual domestic kit; concrete spacers belong where the load is heavier or the fire rating matters. Spacing them at two-metre centres is how the sheet sags into a hammock and the cover at mid-span disappears.
Kilograms of steel per square metre
For a first quote, kilograms per square metre beat a long argument about which sheet to buy.
A393: 6.16 kg/m². A252: 3.95. A193: 3.02. A142: 2.22. Two layers, twice the steel. A 10 mm high-yield bar is about 0.617 kg/m, an 8 mm about 0.395 kg/m — that is (π/4)·D²·7850 kg/m³, not a catalogue spell. This page does that sum. It does not weigh the chairs, and it does not add laps.
linear mass = (π/4) · D² · 7850 kg/m³
Ordering the net area is how the site runs short. Laps and off-cuts eat 10 to 15 %. A take-off on 4.8 × 2.4 m sheets keeps the skip honest; edge off-cuts do for the perimeter. In practice the merchant sells sheets. The calculator sells metres.
A 5 × 4 m garage slab on A393, worked through
20 m², 150 mm, one car. Bottom A393.
Net area 20 m². Laps and off-cuts add 10 to 15 %, so the order is 22 to 23 m². A standard 4.8 × 2.4 m sheet covers 11.52 m² and weighs about 71 kg in A393: two sheets, a mechanical lift, and a few H12s for the perimeter. Chairs 35 to 40 mm, two pitches of lap, a U-bar all round. Concrete volume is 20 × 0.15 = 3 m³ — the mix calculator turns that into cement, aggregate and water. This page stays with the steel.
20 m² × 6.16 kg/m² ≈ 123 kg + edge bars
About 123 kg of fabric, plus the edge bars. Order-of-magnitude. Not a design certificate, not a sign-off for building control. Enough chairs that the mat does not sag, the DPM intact, the sub-base compacted, and the wagon can turn up. Two sheets of 4.8 × 2.4 leave a strip for the short side after the lap; that strip is not waste if the U-bars around the door opening eat it. A third sheet “just in case” usually sits in the rain and rusts before the next job.
Saw-cut joints before the slab picks its own crack
Concrete shrinks. Without a joint, the crack picks its own line — often the worst one, at a doorway or a re-entrant corner.
A ground slab is cut into bays: long side often around 4 to 6 m on domestic work, proportions not too long and thin. Re-entrant corner, threshold, manhole: a joint, not a debate. Saw-cut to about a third of the depth, early — often 8 to 24 hours, as soon as the surface no longer ravels under the blade. Waiting three days “until it is hard” is already too late: the slab has cracked in the night.
A full-depth expansion joint is a different animal. Open slabs, large areas, temperature swing. The fabric stops there. Two extra pitches do not stitch an expansion joint. A 5 × 4 m garage under a roof often lives without one — 20 m², sheltered. A saw-cut at a threshold or a re-entrant corner is still the cheap insurance. Cut too late, it only decorates a crack that has already formed.
Sub-base, blinding and DPM before any steel
The dearest fabric in the yard will not save a soft sub-grade.
Compacted sub-base — Type 1 or a well-graded hardcore, often 150 to 200 mm — is the real floor. Blinding, where it is used, is a thin fine concrete to give a clean working surface, not a structural layer. DPM 1200 gauge (about 300 µm) is lapped 150 to 300 mm, taped, turned up at the edge. That cuts capillary water and keeps the soffit of the steel dry from below. Insulation under the slab? Not a squashable board. DPM above it. Joints in the insulation staggered from the saw-cuts, or a weak line runs through the whole sandwich.
That said, a poorly compacted sub-base shows six months later as a dish under the car, not on pour day. Steel does not fix it.
When the fabric rides the poker
The poker goes in, the concrete turns to soup, a light or badly chaired sheet floats. It turns up under the rake, 20 mm below the finish. No soffit cover left. No steel where the tension is.
Dense chairs, ties, a mix that is not a blancmange, a poker that does not run under the mat “to help it sit”. If the sheet starts to swim, the pour stops, the mat is re-chaired, then it continues — not a boot on the fabric after the wagon has gone. Once it has gone off, the choice is break it out or live with it. There is no third option that stays cheap.
What this calculator leaves out
No laps. No off-cuts. No chairs. No top mat. No edge bars. One grid, bars cut flush to the slab edge.
The number is there to size a first drop, or to compare two pitches. It is not a bill of quantities, and it is not a sign-off. Building control will not stamp a print-out from this page. As soon as the slab is suspended, a motorhome parks on it, the ground is made-up, thickness passes 200 mm, or the plan is an odd polygon, a structural engineer takes over — Eurocode 2, BS 8500, the National Annex. A393 “same as next door” stops at a simple house slab on a known sub-grade.
Exposure classes and BS 8500
Cover is not a matter of taste. It follows the exposure class: how wet the slab will live, and whether chlorides come with the water.
- XC1 — dry interior. Cover can drop.
- XC2 / XC3 — damp, foundations. Typical 25–40 mm depending on the National Annex and BS 8500.
- XC4 — wet/dry cycles, outside. More cover, not less.
A garage slab is usually XC3 or XC4. That 40 mm on the ground is durability, not fuss. A pretty pour with 10 mm of cover still fails in ten years. XF (freeze-thaw) and XD (de-icing salts) stack on top once the slab is outside, in a cold region, or in front of a garage door that brings snow in. That drawing leaves this page.
Glossary
- Rebar
- Reinforcing bar: ribbed high-yield steel (commonly B500B in the UK), cut and bent to a schedule. H10, H12, H16 are the usual site tags for 10, 12 and 16 mm diameter.
- Cover
- The thickness of concrete between the surface of the member and the nearest steel. It protects against corrosion and provides bond. On a UK ground slab, about 40 mm is common; never zero.
- Lap length
- The overlap over which two bars or two fabric sheets transfer force. Rule of thumb: two pitches for fabric, about 40 diameters for a bar in tension.
- A142
- BS 4483 fabric, 142 mm²/m each way (typically 6 mm wires at 200 mm centres, about 2.22 kg/m²). Paths, shed bases, light patios — not a driveway.
- A193
- BS 4483 fabric, 193 mm²/m each way (about 3.02 kg/m²). The light end of domestic slabs, above A142 and below A252.
- A393
- BS 4483 fabric, 393 mm²/m each way (10 mm wires at 200 mm centres, about 6.16 kg/m²). The sheet commonly specified for a private garage on the ground.
- Eurocode 2
- The European design standard for reinforced concrete (EN 1992-1-1), used in the UK with its National Annex and with BS 8500 for durability. It sets cover, minimum areas, laps and detailing, in place of the older BS 8110.