Hydroelectricity converts potential energy — water held up high — into electricity as it falls. Available power depends on two quantities measured on site: the flow rate through the turbine (volume of water per second) and the net head (the elevation drop actually exploited, with pipe friction losses already subtracted).

Unlike solar or wind, a hydroelectric plant can often be dispatched: run at more or less output on demand. That's why annual output depends heavily on the operating regime, not just on the installed power.

Flow, head and efficiency

The plant

Small plant: a few m³/s. Large scheme: several hundred.

Elevation drop actually exploited between the intake and the tailwater, net of pipe friction losses.

Turbine, generator and penstock combined. Well-sized modern turbines: 85 to 92 %.

Operating regime

Share of the year the plant runs at the power calculated above. Rough orders of magnitude: run-of-river 50 to 70 % (near-continuous output, tracking natural flow); peaking/pondage 25 to 45 % (dispatched output, concentrated at peak hours); large storage dams vary widely with reservoir management.

Upstream reservoirQ = 15.0 m³/sTTailwater outletH = 25 m
Principle diagram (example values). The diagram redraws with the entered values after the calculation.

Hydro terms marked with an asterisk are defined in the glossary after the last heading.

Run-of-river, peaking and storage dams

The formula on this page gives the power at a given flow and head. Annual megawatt-hours are another question: they depend on whether the river must be taken as it comes, or water can be parked for later. Three operating regimes cover almost every scheme.

  • Run-of-river. Little or no storage. Output tracks rainfall and snowmelt. Capacity factor is often high (50% to 70% is a fair band) because the machine is on whenever the river is, but it cannot be dispatched at 5 p.m. just because the price spiked.
  • Peaking (pondage). A pond that fills overnight or over a wet weekend, then is drawn down at peak hours. Capacity factor sits lower, around 25% to 45%, because the water was concentrated where it earns.
  • Storage (impoundment). A large reservoir, often high in the hills, holding weeks or a season. Water is released when the system needs it. These are the historical batteries of a hydro country.

Type a 45% capacity factor into the form and the description is a peaking plant, not a failure. A run-of-river scheme at the same 15 m³/s and 25 m will print the same megawatts and a very different year.

Gross head versus net head

Gross head is the elevation difference between the upstream water surface and the tailwater. The turbine never sees all of it. Pipe friction, screens, valves and bends steal metres, and those metres never become watts.

P = η × ρ × g × Q × Hnet

Hnet = Hgross − ΣΔHlosses

Net head* is what this calculator wants — the drop exploited, friction already subtracted. Head losses live mainly in the penstock (friction on the pipe wall), in valves, intake screens and bends (the “minor” losses, which are not always minor), and in the surge chamber and conveyance path. They grow with the square of the flow: double Q, and the lost metres roughly quadruple. That is why a fat, short penstock on a high-head scheme is not vanity. It is net head.

If the dam-crest-to-river number is typed, P is overstated. Walk the intake, or ask the designer for Hnet at the flow that matters.

Pelton, Francis and Kaplan turbines

Pick the wrong runner and the 85% typed in the efficiency box is a fantasy. Each family has a home ground in head and flow.

  • Pelton* — very high heads (H > 200 m) and modest flows. A jet hits buckets on a wheel. Efficiency can reach 90% when the jet is aimed properly.
  • Francis — the common all-rounder, medium heads (20 m < H < 200 m) and medium to high flows. Water enters radially and leaves axially. A wide efficient range, which is why so many dams use it.
  • Kaplan — low heads (H < 20 m) and very high flows. Adjustable blades keep efficiency useful even when the river is sulking (typically 70% to 90% across the working band).

Selection charts plot net head against nominal flow. Sit in the wrong corner and the machine is brilliant at a flow that is not there. A 25 m head at 15 m³/s is Francis country, not Pelton, and a weir on a lowland river is Kaplan country.

Micro-hydropower and permitting

Micro-hydro usually means a scheme below 1 MW — a mill leat, a highland burn, a weir with a new Kaplan in the fish-pass channel. In Britain the paperwork is not a single megawatt threshold. It is a stack of consents, and the stack is what kills more projects than the hydrology.

  • Abstraction and impoundment licences from the Environment Agency in England, Natural Resources Wales, or SEPA in Scotland. No water, no turbine — and “there is already a mill” does not always mean there is already a licence.
  • Planning permission for the powerhouse, pipeline and access. Listed mills and national parks add a round.
  • Grid connection (G98 or G99). Under 3.68 kW per phase is the easy notice; above that the DNO is in the room.
  • Generation licensing. Most small hydro is exempt from an electricity generation licence (the 50 MW line is the one that matters for the big stuff). A way to sell the kWh is still needed — a private wire, or an export tariff.

Feed-in tariffs for new hydro are gone. The Smart Export Guarantee is what remains for the small end; larger schemes may bid a Contract for Difference if a hydro pot is open. A 100 kW plant on a good burn can look lovely on this page and still fail on residual flow. Run the numbers after the hands-off flow is known, not before.

Low flow and floods through the year

Rivers are not a tap. Rain, snowmelt and evapotranspiration write a hydrograph, and the turbine has to live with it.

  • Low-flow periods — late summer, or a dry winter. Flow can drop to 10% to 20% of the mean annual figure. Some plants throttle back, or stop, to leave the mandatory residual flow in the depleted reach.
  • Floods — autumn rain, a rapid thaw. Flow can increase tenfold. Run-of-river then sits at full capacity; a storage scheme can catch the surplus for later.

The flow-duration curve* (how many days a year each Q is exceeded) is the document that sizes the machine and forecasts the year. A single “design flow” copied from a wet April will not do. If Qmean is 15 m³/s and Q95 is 2 m³/s, a turbine rated at 15 will spend a lot of the year part-loaded — or off, once residual flow is taken off the top.

This calculator’s capacity factor is how that curve is folded into one number. 70% means the plant, on average, ran at the power calculated here for 70% of the hours. It does not mean the river was generous 70% of the time.

Pumped-storage hydropower

A pumped-storage* plant is a hydroelectric scheme that spends electricity to pump water uphill, then earns it back through the turbines at peak. It is not a primary source. It only “produces” what it previously consumed, minus the round-trip losses.

  • Absorb surplus generation (wind at 3 a.m., or nuclear that was not asked to turn down) and send it back at tea-time.
  • Round-trip efficiency around 70% to 80% — a fifth to a third is lost, and the plant is bought because the timing is worth more than the kWh.
  • On the GB system the existing fleet is a few gigawatts, not tens. Dinorwig is the name everyone knows.

If a pumped-storage head and a generating-mode flow are put into this form, the generating power appears. A year’s “output” in the run-of-river sense does not. The capacity factor for a pumped-storage station is a market choice, not a rainfall choice. A conventional storage dam at the same head is mining a catchment, not a night-time surplus.

Fish passes and ecological continuity

A weir or a dam is a wall across a river. Migratory fish notice. UK law noticed some time ago, and the residual-flow and pass rules are not a footnote added after the IRR.

  • Residual / hands-off flow*. A depleted reach must keep a minimum in it. Older rules of thumb (around 1/10 of the mean annual flow, or 1/20 on a large river) turn up; modern licences more often hang off Q95 or a seasonally varying hands-off flow set by the EA or SEPA.
  • Fish passes. Ladders, eel passes, bypass channels — salmon, sea trout and eels have to get past. The Eels (England and Wales) Regulations 2009 made screening and passage a hard requirement on many intakes.
  • Monitoring. Counts, surveys, sometimes a camera on the pass. The consent can ask for proof that the pass works, not just that it exists on the drawing.

These constraints cut the usable head, or the usable flow, or both. They are also why the scheme gets built at all. A 15 m³/s design flow with 2 m³/s reserved for the river is 13 m³/s through the runner. Type the 13, not the 15.

Service life and maintenance

Hydro lasts. Civil works — dams, tunnels, penstocks — are routinely quoted at 50 to 80 years, and plenty of Victorian mill sites are turning a runner. That longevity is not free. It is an inspection diary.

  • Annual inspection — screens, valves, the generator, bearings.
  • Five-year overhaul — turbine strip, runner blades, seals, governor.
  • Major ten-year inspection — dam and penstock integrity, foundations, replacement of the distributor, runner or generator if they have earned it.

Annual maintenance typically sits at 1% to 3% of the original capital cost. A modernisation — a more efficient runner, a new governor, automation — can lift efficiency by 5% to 10%, with paybacks often under ten years. That is a real 5% on this page’s η, not a rounding error. A 1920s Francis that has not seen a new runner is not an 85% machine. Ask what was last rebuilt before the default is trusted.

This page sizes hydraulic power from Q, H and η. It is not a yield study, and it is not a licence. Residual flow, flood risk and fish passage can remove a scheme that looks perfect in the formula.

Hydropower in Scotland and Wales

Almost all of Great Britain’s conventional hydro sits in the Scottish Highlands and in the Welsh valleys. SSE’s highland chain — dams, aqueducts, power stations strung along catchments that already did this job for aluminium — is the backbone. Cruachan (a pumped-storage cavern in Ben Cruachan) and Glendoe are the names that turn up in the energy press; dozens of smaller SSE and community schemes fill in the glens.

Wales has Rheidol, Cwm Dyli, Maentwrog, and a scatter of community plants on steep, wet catchments. England’s contribution is small: a few low-head weirs, some restored mills, nothing that looks like a highland storage dam. A 200 m head typed into this form is almost certainly describing Scotland, or a pipe dream in the Peak District.

That geography is why a GB hydro capacity factor is a mix of alpine-style storage and wet-west run-of-river, not a Mediterranean drought story. Snowmelt helps in the Cairngorms. A dry April in Cumbria does not. The wind turbine page is the other half of many highland catchments: the same weather, a different machine.

Dinorwig and the pumped-storage fleet

Dinorwig — Electric Mountain, in the Elidir Fawr slate above Llanberis — is the plant people mean when they say “pumped storage” in Britain. Six reversible Francis units, 1,728 MW, a head of about 500 m, from standing to full load in around 16 seconds. Ffestiniog in north Wales is the older sibling at 360 MW. Cruachan in Argyll is 440 MW, with an expansion on the table. Coire Glas, also in the Highlands, is the big proposed new cavern.

Put Dinorwig’s head and a generating-mode flow into this calculator and a number in the hundreds of megawatts per machine comes back. That is the generating punch. The annual MWh depends on how often the market pays for a climb and a drop, not on Snowdonia rainfall. The upper reservoir is a bowl in the mountain, not a catchment.

A 75% round-trip efficiency means 1.33 kWh in for every kWh out. That is bought because a 1.7 GW spike at 5:30 p.m. is worth more than a night-time surplus sold for peanuts. The formula on this page does not know the price.

Environment Agency and SEPA licences

In England the Environment Agency is the gate on the water. Abstraction, impoundment, flood risk, fish passage, eel screening: that is EA (or NRW in Wales, SEPA in Scotland). Planning sits with the local authority. The grid sits with the DNO. Three desks, three clocks, and none of them is this calculator.

A typical small-hydro path: hydrology and a flow-duration curve; a residual-flow proposal; an environmental report that looks at the depleted reach; then the abstraction/impoundment application; then planning; then G99. Start with the water. A beautiful 25 m head on a designated salmon river with no residual-flow story will not get a licence, and the civils budget will have been spent on a PDF.

A depleted reach that goes dry in August is a dead reach. Type the flow that will be allowed, at the head that will remain, and the page will say whether the scheme is a plant or a hobby.

Glossary

Net head
The elevation drop actually seen by the turbine: gross head minus friction and minor losses in the intake, penstock, valves and tailrace. This page wants net head. Losses grow roughly with the square of the flow.
Pelton, Francis, Kaplan
The three common reaction/impulse families. Pelton: high head, modest flow, a jet on buckets. Francis: medium head, the usual dam turbine. Kaplan: low head, large flow, adjustable blades. Efficiency in the box is only honest inside the right family.
Pumped storage
A hydro plant that pumps water uphill when electricity is cheap or surplus, then generates at peak. Round-trip efficiency is typically 70% to 80%. It stores energy; it does not create a year’s rainfall. Dinorwig is the GB reference plant.
Hands-off / residual flow
The flow that must stay in the depleted reach below an intake. Modern GB licences often hang off Q95 or a seasonal hands-off flow set by the EA, NRW or SEPA. It comes off the top of Q before the turbine sees it.
Flow-duration curve
A plot of how many days a year each flow is exceeded. It sizes the machine and sets a realistic capacity factor. A single “design flow” from a wet month is not a substitute.